McIngvale Road Realignment | Hernando, MS

SERVICES:

Categorical Exclusion

Field Survey

Traffic Engineering

Roadway Design

Traffic Signal Plans

CE&I

Pickering provided design services for the realignment of McIngvale Road from Byhalia Road to Green T Road south of the

Interstate 269 underpass inside the City of Hernando. This new route is approximately 1.4 miles in length and will be a five-lane boulevard section with curb and gutter. This roadway also has a sidewalk and multi-use path for bicyclists and pedestrians.

The plans and specifications were developed in accordance with the latest edition of the Project Development Manual for Local Public Agencies and completed on a very tight schedule.

Professional services include:

  • Topographical & boundary surveys

  • Proposed ROW & easement documentation

  • NEPA documentation

  • Traffic analysis & design

  • Horizontal & vertical geometry design

  • Roadway drainage design

  • Signal modification design

  • Traffic control phasing

  • Signing & pavement marking design

  • Erosion prevention & sediment control plans/stormwater pollution prevention

  • Preparation of bid documents

  • Construction Engineering & Inspection (CE&I)

Key Team Members

Rick+Ferguson.jpg

Rick Ferguson, PE
Project Manager

MF.jpg

Mike Foster, PE, CPESC
Transportation Engineer